Risk Assessment and Risk Register
2023-24

WHICHAM PARISH COUNCIL

RISK REGISTAR AND RISK ASSESSMENT

Risk Assessment Version 9 – April 2024
1

Definition of Risk Management:
Risk is the threat that an event or action will adversely affect an organisation’s ability to achieve its objectives and to successfully
execute its strategies. Risk management is the process by which risks are identified, evaluated and controlled. It is a key
element of the framework of governance together with community focus, structures and processes, standards of conduct and
service delivery arrangements.

This document has been produced to enable the Parish Council to assess the risks that it faces and satisfy itself that it has taken
adequate steps to minimise them. The Council is aware that although some risks can never be eliminated fully, it has in place a
strategy that provides a structured, systematic and focuses approach to managing risk, which:
 Identifies the subject
 Identifies what the risk may be
 Identifies the level of risk
 Evaluates the management and control of the risk and records findings
 Reviews, assesses and revises procedures if required.

FINANCIAL AND MANAGEMENT

Subject Risk(s) /Identified H/M/L Management/Control of Risk Review/Assess/Revise
Business Continuity Risk of Council not being
able to continue its
business due to an
unexpected or tragic
circumstance
L The Council is not responsible for any
vital services
Review plan when necessary
Precept Adequacy of precept
Requirements not
submitted to Cumberland
Unitary Authority
Amount not received by
CUA
L
L
L
Once a year the Council receives a
budget up-date report. Based upon
this it sets the precept requirements
for the coming year which are then
submitted to Cumberland Unitary
Authority
The Clerk/RFO or designated
Councillor would check CUA has
received communication.
Existing procedure adequate
Financial Records Inadequate records
Financial Irregularities
L
L
The Council has Financial Regulations,
which set out the requirements.
Existing procedure adequate.
Review the Financial Regulations
when necessary.
Bank & Banking Inadequate checks
Bank Mistakes
Loss
Charges
L
L
L
L
The Council has Financial Regulations
which set out the requirements for
banking, cheques and reconciliation
of accounts
The Clerk reconciles the bank
accounts when the statements arrive.
The reconciliation is checked by a
Councillor, approved and signed
Existing procedure adequate.
Review the Financial Regulations
when necessary and bank signatory
list when necessary, especially after
an AGM and an election. Monitor the
bank statements quarterly.
Cash Loss through theft or
dishonesty
L The Council has Financial Regulations
which set out the requirements.
Donation boxes on the beach and
Whicham School car park are emptied
on a regular basis ie weekly by the
Clerk and banked within 3 days of
collection. There is no petty cash or
float held.
Existing procedure adequate. Review
the Financial Regulations when
necessary.
Reporting and Auditing Information/
communication
Compliance
L
M
A monitoring statement is produced
when necessary
The Council audits as necessary to
comply with Fidelity Guarantee
Existing communication procedures
adequate.
Council annually to appoint a
Councillor Auditor for Fidelity
compliance
Direct costs
Overhead expenses
Debts
Goods not supplied but
billed
Incorrect invoicing
Cheque payable incorrect
Unpaid invoices
Loss of stock
L
L
L
L
L
The Council has Financial Regulations,
which set out the requirements.
At each Council meeting the list of
invoices awaiting approval is reported
to Councillors and considered.
Council approves the list of requests
for payment
The Council maintains no stock of any
kind, other than the small amount of
clerical supplies sufficient for the
Clerk’s duties.
Existing procedure adequate.
Review the Financial Regulations
when necessary.
Grants & Support Payable Power to Pay
Authorisation of Council to
Pay
L All such expenditure goes through the
required Council process of approval,
minuted and listed accordingly if a
payment is made using the S137
power of expenditure.
Existing procedure adequate.
Parish Councillors request a S137
rules if required.
Grants Received Receipts of Grants L The Parish Council does not presently
receive any regular grants. One-off
grants would come with terms and
conditions to be satisfied.
Procedure would need to be formed,
if required.
Charges – Rentals Payable Payments of charges,
leases, rentals
L The Council has no rented property Existing procedure adequate.
Charges – Rentals Receivable Receipt of rental
Insurance implication
L
M
The council currently does not rent
out any land.
Insurance paid annually
Ensure payment and copy of
insurance document received if
appropriate.
Best Value Accountability Work awarded incorrectly
Overspend on services
L
M
Parish Council practice would be to
seek, if possible, more than one
quotation for any substantial work
required to be undertaken or goods.
For major contract services, formal
competitive tenders would be sought.
If a problem is encountered with a
contract the Clerk would investigate
the situation, check the
quotation/tender, research the
problem and report to Council.
Existing procedure adequate.
Include when reviewing Financial
Regulations.
Salaries & Assoc. Costs Salary paid incorrectly
Wrong hours paid
Wrong rate paid
False employee
Wrong deductions of NI or
Tax
Unpaid NI or Tax
contributions to the Inland
Revenue
L
L
L
L
L
L
The Parish Council authorises the
appointment of all employees
through the Full Council. Salary rates
are assessed annually by the same
Council and applied on 1 April each
year.
Salary analysis and slips are produced
by the Clerk quarterly together with a
schedule of payments to the Inland
Revenue (for Tax & NI). These are
inspected at the Council meetings and
signed off. The Tax and NI payments
are worked out using an Inland
Revenue computer programme
updated annually. All Tax & NI
payments are submitted in the Inland
Revenue Annual Return.
There are no employees other than a
part-time Clerk.
Existing appointment and payment
system is adequate.
Employees Loss of key personnel
Fraud by Staff
Actions undertaken by staff
Health and Safety
L
L
L
L
In the absence of the clerk a
temporary appointment would be
made.
The requirements of the Fidelity
Guarantee Insurance to be adhered
to with regards to fraud.
The Clerk should be provided with
relevant training, reference books,
access to assistance and legal advice
required to undertake the role.
Note: The Council could function
without a Clerk for a short period.
Existing procedure adequate.
Purchase revised books
Council member of SLCC
Monitor working conditions, safety
requirements and insurance
regularly.
Councillor Allowances Councillors overpaid
Negativ
e
No allowances are allocated to Parish
councillors
No procedure required
Election Costs Risk of an election cost Risk is higher in an election year.
When an election is due the Clerk will
obtain an estimate of costs from the
Borough Council for a full election
and an uncontested election. There
are no measures, which can be
adopted to minimise the risk of
having a contested election, as this is
a democratic process and should not
be stifled.
Existing procedure adequate
VAT Re-claiming/charging L The Council is registered for VAT. The
Vat is reclaimed once only, after the
end of each Financial Year 31st March.
This is the responsibility of the
RFO/Clerk
Existing procedure adequate.
Annual Return Submit within time limits L The annual return must be agreed at
a Council meeting and duly signed by
the Chairman and RFO/Clerk. The
return must be submitted by the time
given by the Audit Office.
Existing procedure adequate.
Legal Powers Illegal activity or payments L All activity and payments within the
powers of the Parish Council to be
resolved and minuted at a Full Parish
Council Meeting.
As Financial Regulations
Minutes/Agendas/Notices/
Statutory Documents
Accuracy and legality
Business Conduct
L
L
Minutes and agenda are produced in
the prescribed method by the Clerk
and adhere to the legal requirements.
Minutes are approved and signed at
the next Council meeting.
Minutes and agenda are displayed
according to the legal requirements.
The Chair should manage business
conducted at Council meetings.
Existing procedure adequate.
Guidance/training to Chair should be
given (if required).
Members to adhere to Code of
Conduct.
Members Interests Conflict of interest
Register of Members
Interest
L
M
Although not a requirement, the
declaring of interests by members at
a meeting should be an obvious
process to remind Councillors of their
duty and should remain on the
agenda.
Councillors should review their
register of Members Interest Forms
regularly.
Existing procedure adequate.
Members take responsibility to
update their Register.
Insurance Adequacy
Cost
Compliance
Fidelity Guarantee
L
L
L
M
An annual review is undertaken
(before the time of the policy renewal)
of all insurance arrangements in
place. Employers and Employee
liability insurance is a necessity and
must be paid for. Ensure compliance
measures are in place. Ensure Fidelity
checks are in place.
Existing procedure adequate.
Review insurance provision annually.
Review of compliance.
Data Protection Policy Provision
Loss of data through
theft/loss of laptop
Data storage inadequate
L
M
L
The Council only keeps the names,
addresses and interests of members
A laptop is used exclusively for Parish
Council business and is only
accessible to the Clerk
A Data Protection Policy has been
approved and implemented.
All information automatically backed
up to Google icloud and 2 hard drives
All councillors have individual email
addresses linked to the website.
Purchase of lockable filing cabinets
for the storage of data
Freedom of Information Policy Provision L/M The Clerk is aware that if a substantial
request arrives that this may require
considerable additional work. The
Council is able to request a fee if the
work will take more than 15-hours,
but the applicant also has the right to
re-submit the request broken down
into sections, thus negating the
payment of a fee.
A Freedom of Information Policy has
been implemented and approved by
the Council
Monitor and report any impacts of
requests made under the Freedom of
Information Act.

PHYSICAL EQUIPMENT OR AREAS

Subject Risk(s) /Identified H/M/L Management/Control of Risk Review/Assess/Revise
Assets Loss or damage
Risk/damage to third
party(ies)/property
L
L
An annual review of assets is
undertaken for insurance purposes
Existing procedure adequate
Maintenance Poor performance of assets
or amenities
Loss of income or
performance
Risk to third parties
L
L
L
The Council has the following assets
Four planters and car park area at the
beach on Silecroft and Whicham old
School car park, two play areas one at
Kirksanton and the other at Silecroft.
The condition of which is under
constant review and periodic
maintenance.
All public amenity land is inspected
regularly by parish employees (i.e. the
beach area). The two play areas are
annually inspected by ROSPA.
In 2017 the PC took over the
responsibility of the toilets located on
Silecroft Beach Front. A Cleaner is
contracted to check and clean the
toilets on a daily basis and to report
any faults to the Clerk.
A covid risk assessment was
undertaken for the toilets and the play
areas and actions implemented
Existing procedure adequate.
Ensure inspections are carried out
regularly.
A separate risk assessment to be
undertaken on the play areas with a
weekly visual inspection regime on
equipment as per current guidance.
Notice Boards Risk/Damage/Injury to third
parties
Road side safety
L
L
The Parish Council have three notice
boards. All locations have approval by
relevant parties. The Clerk inspects
these regularly and necessary repairs
are attended to after requirements
brought to the attention of the Parish
Council.
Existing procedure adequate.
Street Furniture Risk/damage to third
parties
L The Parish Council has four planters
situate at The Kirksanton and Silecroft
and 7 public seats located around the
Parish and 6 seats located on the beach
front at Silecroft. These are inspected
by members of the Council regularly
and necessary repairs are attended to
after requirements brought to the
Parish Council’s attention.
The council is responsible for 2 street
lights, 1 at Kirksanton and 1 solar light
located at Silecroft
Existing procedure adequate.
Meeting Locations Adequacy
Health & Safety
L
M
The Parish Council meetings are held at
Silecroft Village Hall and Kirksanton
Village Hall. The premises and the
facilities are considered to be adequate
for the Clerk, Councillors and Public
who attend from Health and Safety and
comfort aspects.
Existing locations adequate.
Council Records – paper Loss through theft,
Fire,
Damage
L
M
L
The Parish Council records are stored
at the home of the Clerk. Records
include historical correspondence,
minute books and copies, leases for
land or property, records such as
personnel, insurance, salaries etc.
Recent materials are in a metal filing
cabinet (not fire proof) and older more
historical records in separate filing
cabinet.
Damage (apart from fire) and theft is
unlikely and so provision adequate.
Deeds/leases copied and deposited
off-site.
To monitor storage problem with a
view to sending historical items to
the Local Archives Department.
Council Records – electronic Loss through:
Theft, fire damage,
corruption of computer
L/M The Parish Council’s electronic records
are stored on the Parish Council’s
computer. Back ups of the files are
taken at regular intervals and stored on
an external hard drive and
automatically backed up on to Google
drive.
Council to look at other methods of
backing up electronic data.

SILECROFT PLAY AREA

It is recognised that there is a duty of care on behalf of the Council to ensure that the play areas are safe for children
to use. However, there is an expectation of duty of care of parents to supervise their children when using the play
areas to ensure that equipment is being used appropriately.
There is an expectation on the community to report any inappropriate use of the play area by persons for whom it was
not designed eg young adults to the Council and if appropriate to the police if causing a nuisance.

Subject Hazard(s) /Identified H/M/L Management/Control of Risk Review/Assess/Revise
Swings (WOODEN FRAME)
– Baby
– Older children
Poor maintenance of seats
resulting in potential trap
risks, seats failing to take
weight of child resulting in
injury to child
Damage to supporting
chains,
“D” clips
Poor supervision by parents
Frame in poor condition
L
L
M
H
A weekly visual inspection of
equipment to be undertaken and
recorded.
Any defects to be reported at once and
equipment taken out of service until
repairs have been executed
An annual inspection of equipment is
undertaken by ROSPA
The play equipment was replaced with
new in 2016
Existing procedure adequate
Slides – Plastic
– Older Children
Slide being used
inappropriately by children
ie small children using big
slide
Fall from height – falling
from top of slides or from
sides of structure when
climbing inappropriately
Slip/Trip/Fall when
mounting steps of slide
L
L
L
Parents are required to supervise
children at all times and ensure that
the equipment is being used
appropriately.
A weekly visual inspection of
equipment to be undertaken and
recorded.
Any defects to be reported at once and
equipment taken out of service until
repairs have been executed
An annual inspection of equipment is
undertaken by ROSPA
Existing procedure adequate.
New equipment installed 2016
.
Spring rides (3) Older children using them
inappropriately
The rides are designed for
young children, older
children using them may
make the ride move
unpredictably and either
cause the equipment to fail
or the child to be thrown
off.
L Parents are required to supervise
children at all times and ensure that
the equipment is being used
appropriately.
A weekly visual inspection of
equipment to be undertaken and
recorded.
Any defects to be reported at once and
equipment taken out of service until
repairs have been executed
An annual inspection of equipment is
undertaken by ROSPA
Existing procedure adequate.
Grass area Litter, broken glass etc
Holes causing trip hazards
L Litter bins are provided.
Notices have been displayed regarding
litter.
Parents are expected to supervise
children at all times.
A weekly visual inspection to be
undertaken to ensure that there are no
obvious causes for concern.
Existing procedures adequate.
Picnic tables and seating Cuts due to broken wood
on tables or seating
L A weekly visual inspection to be
undertaken to ensure that there are no
obvious causes for concern.
Any defects to be reported at once and
equipment taken out of service until
repairs have been executed
Existing procedure adequate

KIRKSTANTON PLAY AREA

It is recognised that there is a duty of care on behalf of the Council to ensure that the play areas are safe for children
to use. However, there is an expectation of duty of care of parents to supervise their children when using the play
areas to ensure that equipment is being used appropriately.
There is an expectation on the community to report any inappropriate use of the play area by persons for whom it was
not designed eg young adults to the Council and if appropriate to the police if causing a nuisance.

Subject Hazard(s) /Identified H/M/L Management/Control of Risk Review/Assess/Revise
Swings
– Baby
– Older children
Poor maintenance of seats
resulting in potential trap
risks, seats failing to take
weight of child resulting in
injury to child
Damage to supporting
chains,
“D” clips
Poor supervision by parents
L
L
M
A weekly visual inspection of
equipment to be undertaken and
recorded.
Any defects to be reported at once and
equipment taken out of service until
repairs have been executed
An annual inspection of equipment is
undertaken by ROSPA
Existing procedure adequate
Equipment replaced with new in
2016
Slides Plastic
– Baby
– Older Children
Slide being used
inappropriately by children
ie small children using big
slide
Fall from height – falling
from top of slides or from
sides of structure when
climbing inappropriately
Slip/Trip/Fall when
mounting steps of slide
Damage to platform
resulting in trap hazards or
child falling through.
Slide poorly maintained
resulting in injury to child
from protruding parts
Poor supervision by parents
L
L
L
L
L
M
Parents are required to supervise
children at all times and ensure that
the equipment is being used
appropriately.
A weekly visual inspection of
equipment to be undertaken and
recorded.
Any defects to be reported at once and
equipment taken out of service until
repairs have been executed
An annual inspection of equipment is
undertaken by ROSPA
Existing procedure adequate.
.
Spring rides (3) Older children using them
inappropriately
The rides are designed for
young children, older
children using them may
make the ride move
unpredictably and either
cause the equipment to fail
or the child to be thrown
off.
L Parents are required to supervise
children at all times and ensure that
the equipment is being used
appropriately.
A weekly visual inspection of
equipment to be undertaken and
recorded.
Any defects to be reported at once and
equipment taken out of service until
repairs have been executed
An annual inspection of equipment is
undertaken by ROSPA
Existing procedure adequate.
Grass area Litter, broken glass etc
Holes causing trip hazards
L Litter bins are provided.
Notices have been displayed regarding
litter.
Parents are expected to supervise
children at all times.
A weekly visual inspection to be
undertaken to ensure that there are no
obvious causes for concern.
Existing procedures adequate.
Picnic tables and seating Cuts due to broken wood
on tables or seating
L A weekly visual inspection to be
undertaken to ensure that there are no
obvious causes for concern.
Any defects to be reported at once and
equipment taken out of service until
repairs have been executed
Existing procedure adequate

SILECROFT BEACH FRONT TOILETS

The Council recognizes that it has a duty of care to ensure anyone using its facilities are safe, however, it expects members of the public to take care and
not damage or vandalise the property when in use.

Subject Hazard(s) /Identified H/M/L Management/Control of Risk Review/Assess/Revise
Slip/trip/falls
–
Wet floors due to cleaning
or inclement weather
Debris being blown in or
brought in by users
L
L
The toilets are checked on a daily basis
The floors are concrete and are of a
finish that reduces the risk of slipping
when wet
Existing procedure adequate
Vandalism The toilets are located away
from visual sight of local
residents and are therefore
vulnerable to vandalism
during night hours
L
L
L
The toilets are checked on a daily basis
by the cleaner
The toilets are locked overnight
The toilets are insured
Existing procedure adequate.
Burst pipes/flooding During extreme cold
weather or poor
maintenance a pipe may
burst causing flooding
L The toilets are checked on a daily basis
All pipes have been suitably lagged to
prevent freezing
Existing procedures adequate
Cleaner fails to clean toilets Toilets are not cleaned
posing a health risk to users
L The cleaner has a cleaning schedule to
keep to.
The Cleaner to report illness or inability
to clean the toilets to the Clerk
Existing procedures adequate

The above Risk Assessment was approved at the Meeting of Whicham Parish Council on:.
Amendments to previous year in red
Approved by Whicham Parish Council at its meeting on 3 April 2024